We had a design team meeting on site this week for our new pool house in the South Downs National Park. The weather was pretty awful but we battled through the conditions and discussed the technical aspects of the air source heat pump and ventilation strategy. This is an essential element for an indoor pool to reduce condensation and allow the building to work. We are all making sure it is an integrated solution that doesn’t detract form all the quality details in the interior!

The shuttering is at the finished ground level and the main slab has already been poured! We are looking forward to seeing the oak frame go up over the next month.